PIR: Difference between revisions
Jump to navigation
Jump to search
Cassie Helio (talk | contribs) |
Cassie Helio (talk | contribs) No edit summary |
||
Line 2: | Line 2: | ||
It shows: | |||
*the order of contracts in our queue | *the order of contracts in our queue | ||
*it separates rush contracts, normal contracts and JF contracts | *it separates rush contracts, normal contracts and JF contracts | ||
Line 9: | Line 9: | ||
*it has an integrated set waypoint and set destination feature | *it has an integrated set waypoint and set destination feature | ||
Your in corp toon and haulers Authenticate with PIR with Eve's SSO to function using a browser. | |||
You can get very accurate estimates by timing a Jita >> Rens (or opposite) and then dividing the result by 26. | You can get very accurate estimates by timing a Jita >> Rens (or opposite) and then dividing the result by 26. |
Revision as of 00:36, 30 March 2017
PIR (Push Internal Resources) is a tool to help with the administrative side of delivering contracts.
It shows:
- the order of contracts in our queue
- it separates rush contracts, normal contracts and JF contracts
- it highlights contracts with the wrong rewards
- it has an integrated evemail generator
- it has an integrated set waypoint and set destination feature
Your in corp toon and haulers Authenticate with PIR with Eve's SSO to function using a browser.
You can get very accurate estimates by timing a Jita >> Rens (or opposite) and then dividing the result by 26.