Split Contracts & Multiple Pick Ups: Difference between revisions

Jump to navigation Jump to search
Line 30: Line 30:
* The longest distance contract should be marked as "Multi Pick Up 1/X" in the "Info by Issuer" field and each additional contract should be marked as "Multi Pick up 2/X" etc.
* The longest distance contract should be marked as "Multi Pick Up 1/X" in the "Info by Issuer" field and each additional contract should be marked as "Multi Pick up 2/X" etc.
* '''For JF Multi Pick Ups:'''
* '''For JF Multi Pick Ups:'''
** For pickups on the same route, add 1 additional cyno fee.
** For pickups on the same route, add 1 additional system fee.
** For pickups in the same system, add 2 additional cyno fees.
** For pickups in the same system, add 2 additional system fees.
** Add contract,  "JF" to the "Info by Issuer" field: e.g. "JF Multi Pick Up 1/2" and "JF Multi Pick Up 2/2"
** Add contract,  "JF" to the "Info by Issuer" field: e.g. "JF Multi Pick Up 1/2" and "JF Multi Pick Up 2/2"
* If the contract is intended to be a Rush, add "Rush" to the "Info by Issuer" field: e.g. "Rush Multi Pick Up 1/2" and "Rush Multi Pick Up 2/2"
* If the contract is intended to be a Rush, add "Rush" to the "Info by Issuer" field: e.g. "Rush Multi Pick Up 1/2" and "Rush Multi Pick Up 2/2"
Bureaucrats, Interface administrators, push, push-admin, push-director, push-manager, push-senior, Administrators
985

edits

Navigation menu